§ 72-621. Erosion control.  


Latest version.
  • Seeding, mulching, sodding and/or other acceptable methods shall be performed as required to prevent undue erosion during all construction activities. During construction and through the developer maintenance period, the developer shall be required to keep accumulations of sand and earth out of the curb and gutter. Temporary siltation basins may be required during construction. Maintenance shall be provided by the developer for the one-year period of the road guarantee and for each lot, until final inspection is passed.

(Ord. No. 96-32, § XXVIII, 12-19-96; Ord. No. 2008-25, § III, 12-4-08)