§ 122-199. Reclaimed water metering requirements.  


Latest version.
  • Reclaimed water shall only be supplied through metered connections. There shall be no free service. The director shall determine the size and type of meter required for each service. All meters for the reclaimed water system shall be installed by the county unless provided otherwise in a written agreement with the county.

(Ord. No. 96-15, § XXI, 6-20-96; Ord. No. 01-10, § 44, 4-5-01)