§ 122-62. Construction of on-site facilities in developments.  


Latest version.
  • Each developer shall be responsible for the design, installation, inspection and testing of the complete water distribution, reclaimed water distribution and sewage collection systems located in the streets adjoining or within the boundaries of the developer's property. The term "complete water distribution, reclaimed water distribution and sewage collection systems," as used in this section, shall include all component parts of a water distribution system, including water mains, valves, fittings, services, hydrants and all appurtenances as shown upon the approved design of such water distribution system, all components of a reclaimed water distribution system including reclaimed mains, values, fittings, services and appurtenances, and all the component parts of the sewage collection system, including all collection mains, laterals to the point of cleanout within rights-of-way or easements, force mains, lift or pumping stations, including the site for same, and all other appurtenances as shown on the approved design for the installation of such sewage collection system.

(Res. No. 86-116, § 32, 8-14-86; Ord. No. 01-10, § 24, 4-5-01)